TENANT IMPROVEMENTS

UCare Second & Third Floor Remodel

UCare is a provider of Medicare plans throughout Minnesota.

UCare recently hired Prime General Contractors to build out their second and third floor spaces at their headquarters. The existing 100-year-old building has rich and warm exposed timber with direct/indirect LED lighting throughout.

 

The project included new flooring, updating lighting, reconfiguring existing walls, refreshing the convenience centers, and installing KI demountable wall partitions.

 

The construction project was a success, completed on time and within budget with minimal impact to the owner’s daily operations.

Project Specs:

  • UCare Second & Third Floor Remodel

  • Project Size: 55,949 SF

  • Owner: UCare

  • Owner Representative: Cresa Minneapolis

  • Design Team: DLR

  • Completion date: March 2021

1/31

Recent Tenant Improvement Projects:

  • Knollwood Place Apartments First & Second Level Renovations & Repositioning

  • Knollwood Place Apartments Commercial Kitchen Remodel

  • Salvation Army Safebay

  • QTS Lobby

  • Bennet Material Handling

  • York Gardens

  • Keg and Case Tenants

  • Schmidt Rathskeller

  • Clutch Brewing

  • Brown and Bigelow Interior Remodel

  • Hagberg’s Meat Market Remodel

  • Entegris Remodel

  • Merrick Community Services

MGK

Chaska Addition and Tenant Improvement

 

Prime recently completed a project with MGK in Chaska. The project consisted of a new precast building addition with offices and shop area, a new front reception area, remodeled restrooms, elevator, new steel mezzanine, interior remodel, exterior steel break room deck, and new concrete loading dock with steel enclosure.

 

The project had its challenges and Prime was able to respond with effective and economical solutions to complete the project.

 

Prime is currently working on the new fire suppression and containment project in MGK's warehouse. We have been working with MGK and FM Global to provide solutions to incorporate a K16.8 sprinkler system with a 600 gallon bladder tank that will hold the AR-AFFF foam concentrate.

Project Specs:

  • MGK Building Addition & Tenant Improvements

  • Project Size: Building addition 2,800 SF, Tenant Improvement 10,360 SF, New loading dock structure 1,018 SF

  • Owner: MGK

  • Design team: Pope Architects

  • Completion Date: November 2020