top of page
PrimeGC_UCare_MPLS-1 copy.jpg

Guaranteed Maximum Price (GMP) Contracts

A GMP contract establishes a price, for a specific scope of work, that cannot be exceeded. GMP contracts are used on fast-track projects or when the design is incomplete at the time construction starts.

​​

Prime excels at leading GMP project teams. We emphasize collaboration with the design team from the earliest stages of the project.

​

Our objective will be to control building costs, manage scope and schedule, and value engineer wherever possible.

MN_Hillel_0006.jpg
bottom of page