top of page

Guaranteed Maximum Price (GMP) Contracts
A GMP contract establishes a price, for a specific scope of work, that cannot be exceeded. GMP contracts are used on fast-track projects or when the design is incomplete at the time construction starts.
Prime excels at leading GMP project teams. We emphasize collaboration with the design team from the earliest stages of the project.
Our objective will be to control building costs, manage scope and schedule, and value engineer wherever possible.

bottom of page