Medica Office Remodel 60,000 SF Transformation Near Carlson Towers

Writer: Derek Clarkin
Derek Clarkin
11 minutes ago
2 min read

A large office remodel is never just a construction schedule. It is a sequence of decisions that affect cost, tenant comfort, building systems, safety, and the final experience of everyone who uses the space.


The Medica office remodel near the Carlson Towers complex is a strong example of that balance. The tenant improvement project covers roughly 60,000 square feet of existing commercial office space, with major work on Floor 3 and Floor 4. The remodel began in September 2026 and is scheduled to conclude in March 2027.


The scope includes selective and full demolition, floor grinding, framing, new walls, HVAC, electrical, low-voltage systems, unique 9-foot doors, and bathroom refinishing on the fourth floor. It is a complex tenant improvement project in an active commercial setting, which makes planning and phasing just as important as the finished construction.



Demolition down to concrete sets the tone


The remodel required a complete demolition approach, taking existing spaces down to the concrete. That level of demo creates a clean starting point, but it also reveals the real conditions of the building.


Once finishes are removed, teams can verify:


  • Existing slab condition

  • Wall and ceiling conflicts

  • Mechanical pathways

  • Electrical routing

  • Low-voltage access

  • Fire and life safety coordination points

  • Conditions around bathrooms and shared building core areas


Floor grinding on both levels is an important part of the work. It prepares the slab for future finishes and helps address uneven surfaces, adhesives, coatings, or other remnants from previous buildouts.


For owners and design firms, this is where field communication pays off. Drawings set the plan, but demolition exposes the building’s history. A responsive team can adjust framing, layouts, and system coordination before those hidden conditions become bigger problems later in the schedule.


Special care around occupied space


One of the most sensitive parts of the Medica remodel is the third floor work around existing occupied tenant space.


Occupied construction changes the job-site rhythm. Noise, dust, access, deliveries, working hours, and safety barriers all need tighter control. The goal is to keep construction moving without disrupting the tenants who remain in the building.


On Floor 3, that meant careful coordination around:


  • Temporary separations from active tenant areas

  • Controlled demolition and debris removal

  • Dust management

  • Safe access paths

  • Clear communication on work zones

  • Scheduling noisy work with the least disruption possible


This kind of phasing is where experienced commercial remodelers prove their value. It is not only a matter of building walls correctly. It is also about helping the building continue to function while the work takes place.


Planning supports a full workplace reset


The Medica Hopkins office remodel near Carlson Towers shows how much planning sits behind a successful commercial transformation. The visible work includes demolition, framing, walls, doors, floors, bathrooms, and finishes. The less visible work includes coordination, sequencing, tenant protection, system planning, communication, and quality control.


For owners and design teams in the Twin Cities area, Minneapolis, St. Paul, and nearby communities, the lesson is clear. A major office remodel works best when construction planning starts early and stays closely tied to design intent.


The strongest projects do not treat demolition, systems, and finishes as separate tasks. They connect each step so the finished space performs well, looks complete, and supports the people who will use it every day.